Charging ahead? Long-duration energy storage credit outlook under the cap and floor regime

Stay informed via our mailing list

subscribe

Introduction

Long-duration energy storage (LDES) can play a key role in balancing electricity supply and demand by storing power and dispatching it to the grid as needed, supporting the continued expansion of renewable energy. It also helps mitigate the price volatility often linked to renewable power sources.  This report examines the current LDES landscape in the UK, introduces the newly approved Cap and Floor regime for LDES,[1] and explains how the regulatory framework may impact the credit quality of LDES projects, in the context of ARC Ratings’ Global Project Finance Methodology.

  • The Cap and Floor mechanism improves revenue visibility. Without a revenue backstop, capital-intensive LDES technologies struggled to attract private capital as their cash flows depend on volatile arbitrage spreads and short‑term ancillary service contracts. By providing a regulated cash stream calibrated to recover debt service, operating costs, capital expenditure and interest during construction through network charges, the revenue floor converts merchant volatility into quasi‑regulated revenue, significantly improving its visibility.
  • Revenue above the floor may be volatile. While the Cap and Floor regime offers a degree of revenue stability, it does not completely eliminate market risks. LDES revenue streams are similar to those of a typical storage asset and include capacity and ancillary payments, and market-driven arbitrage relying on volatile and difficult-to-predict spreads in power prices. This merchant-like exposure, if unmitigated, may cause revenue and cash flow volatility above the floor level, limiting rating case forecast DSCRs.
  • Final regulatory parameters will impact credit risk. Financial profiles and credit quality of potential LDES projects will depend, among other factors, on the calibration of final regulatory parameters that will constitute the revenue floor. These include definitions of efficient operational and capital expenditures, non‑controllable pass‑through cost items, operational availability targets and performance incentives, cost-of-debt, and the approach to revenue support beyond the initial 25-year timeframe for longer-dated projects.
  • Technology and asset class-specific risks could be a challenge. LDES projects may exhibit elevated construction‑phase risk profiles, driven by factors such as the scope of civil works, or the use of developing technologies. On a comparative basis, interconnector construction bears a somewhat lower construction risk due to a relatively standardised and well-established construction profiles. LDES projects may also have higher operating risk, driven by more complex processes related to power conversion for storage, higher degradation rates and, in some cases, lower technological maturity.

Strong contractual and financing arrangements could offset some project risks. Project-specific features, when well-calibrated, can offset construction and operational risks and support stronger credit ratings. These include protective project features such as experienced EPC contractors with strong credit profiles, ease of contractor replacement, contract terms that incentivise timely completion, fixed-price operation and maintenance agreements and comprehensive insurance. A strong financing package, supported by robust structural features, could help protect lenders from the downsides.

[1] Long Duration Electricity Storage technical document (Mar-25) – UK DESNZ

Documents

Arc Ratings - Download Document

Charging Ahead? Long-Duration Energy Storage Credit Outlook under the Cap and Floor Regime

14 May 2025

Contacts

Analytical

Arc Ratings - Jaime Wild

Business development

Arc Ratings - Jason Barrass
Arc Ratings - Rhonda Moore

Latest ratings